About the Project
Polysolar have provided Mid-Suffolk District Council in Stowmarket with the installation of a solar carport structure, a battery storage system and electric vehicle (EV) charging points. The carport structure is located outside of the Kingfisher Leisure Centre.
- Installation Date:
- July 2022
- Power generated:
- 200.4kWp