About the Project

Polysolar have provided Babergh District Council in Sudbury with the installation of a solar carport structure, a battery storage system and electric vehicle (EV) charging points. The carport structure is located outside of the Kingfisher Leisure Centre.


Installation Date:
June 2023
Power generated:
110.4kWp